Build one version-controlled loss schedule that reconciles the affected packages and kilograms to the commercial records, shows every valuation assumption, and keeps insurance, carrier, seller and salvage recoveries in separate columns. Start with the gross economic loss, then apply each policy, contract, legal limit, deductible and credit only in its own track. The invoice total is not automatically the recoverable amount.

This method begins after the buyer has protected notice and survey rights with the cargo-damage evidence workflow. It calculates and reconciles the claim; it does not decide food safety, legal liability or insurance coverage.

Separate the loss from the routes that may pay it

TrackQuestion answeredControlling evidence
Economic lossWhat quantity and value were actually lost, reduced or spent?Tally, weights, invoice, arrival values, survey, disposition and paid costs
Cargo insuranceWhat amount is recoverable under the actual policy?Policy valuation, covered peril, exclusions, deductible, approvals and settlement rules
Carrier or custodianWhat liability can be established against the responsible transport party?Carriage contract, custody evidence, governing regime, limits and time bars
Seller contractWas there a separate pre-risk quality, packing or quantity breach?Specification, risk point, approved sample, inspection clause and remedy terms
Salvage or other creditWhat value was recovered from the affected goods or another payer?Authorised sale, net proceeds, insurer instructions and settlement allocation

Do not add the five results together. They are linked views of one event. Insurance payment may create subrogation rights, a carrier payment may reduce the outstanding insured loss, and salvage proceeds may already be reflected in the damaged value.

Use a twelve-line claim-recovery schedule

LineRecordControl question
1. File identityClaim, policy, shipment, container, seal, lot, currency and schedule versionCan every line be tied to one controlled incident?
2. Shipped baselinePackages, net/gross weight and value by tea item and lotDoes it reconcile to invoice and packing list?
3. Arrival tallySound, short, damaged, held and unexamined quantitiesAre packages and kilograms both reconciled?
4. Final dispositionReleased, reconditioned, diverted, sold, returned or destroyed quantityDoes the mass balance close without overlap?
5. Sound valueEvidence and date for gross sound value at the relevant placeIs the basis comparable to the damaged value?
6. Damaged valueAuthorised net sale evidence or defensible valuation of affected teaAre sale charges and restrictions treated consistently?
7. Cargo lossTotal loss, quantity shortage or percentage depreciation calculationDoes the formula match the policy and applicable law?
8. Preservation costsSurvey, testing, storage, segregation, mitigation and approved treatmentIs each paid cost necessary, evidenced and recoverable in this track?
9. Exclusions and deductionsDeductible, franchise, uninsured portion, taxes or non-covered costsWas each deduction applied once and to the correct base?
10. Third-party limitsCarrier package/weight limit, declared value, liability defence and time barHas qualified advice confirmed the governing route?
11. Credits and paymentsSalvage, refunds, seller credits, carrier payments and interim insuranceHas any amount been counted twice?
12. Outstanding balanceClaimed, agreed, paid, rejected and reserved amounts by counterpartyCan finance close the file without impairing remaining rights?

Apply value formulas carefully

The United Kingdom's Marine Insurance Act 1906 is a jurisdiction-specific legal reference, not a universal claims formula. Subject to the policy, section 71 distinguishes a totally lost part from goods delivered damaged. For delivered damage, it uses the proportion by which gross damaged value falls below gross sound value at the place of arrival, then applies that proportion to the relevant insured value.

For a teaching example only, assume the comparable gross sound value is USD 3.20/kg and gross damaged value is USD 1.00/kg. The depreciation ratio is (3.20 - 1.00) / 3.20 = 68.75%. If the policy allocates USD 6,160 of insured value to the affected part, the provisional damage line is USD 4,235 before the deductible, coverage findings and other adjustments. Do not subtract salvage again if the USD 1.00 damaged value already came from that sale.

A physical shortage needs a different calculation from depreciation. Reconditioning cost is not automatically the loss amount, and survey or mitigation expenses should remain separate from cargo depreciation until the policy and adjuster confirm treatment.

Build the schedule in eight controlled steps

1. Freeze the documents and currency

Index the signed sale contract, commercial invoice, packing list, issued bill of lading, policy/certificate, delivery record, survey, photographs, test reports and disposition approvals. Record the policy currency, invoice currency, exchange-rate source and applicable date instead of converting different lines ad hoc.

2. Reconcile physical quantity first

Start with shipped packages and weight. Reconcile sound, short, damaged, sampled, processed, waste, salvage and destroyed quantities. Keep targeted damage samples separate from representative lot results. If the tally cannot close, return to the survey and sampling record before valuing the loss.

3. Freeze the disposition boundary

The same kilograms cannot be both totally lost and sold as usable salvage. Link each quantity to the authorised reconditioning, salvage or destruction decision. Food-safety approval and insurer consent are separate: neither creates the other.

4. Evidence sound and damaged values on a comparable basis

Record place, date, market level, quantity, quality, duties, landing charges and sale charges behind each value. A distressed offer from an unapproved buyer is not automatically a reliable damaged value. Ask the surveyor or adjuster which offers, sales method and deductions are acceptable before irreversible sale.

5. Calculate insurance without assuming coverage

Use the verified policy record to identify insured value, covered interest, peril, exclusions, deductible, limits and approved expenses. The Marine Insurance Act also separates particular loss, salvage charges, sue-and-labour expenses and general average. Keep them on different lines; yesterday's general-average security is not this cargo-depreciation calculation.

6. Build carrier and seller tracks separately

The carrier claim may use a different value rule and be limited by package, unit or weight under the governing carriage regime. The UK's Hague-Visby implementation, for example, refers to value at the place and time of discharge and contains liability limits and a one-year suit time bar. It is not a universal China-export rule. Separately test whether a seller remedy exists under the quality-claim contract; do not turn transit wetting into a factory defect without evidence.

7. Apply costs, credits and approvals once

Attach paid invoices for necessary survey, storage, testing, segregation and mitigation. The IUMI-hosted cargo guide emphasises evidence, survey, carrier notice, retention of damaged goods and documentation. It is a trade reference, not a policy or coverage decision. Record salvage and every third-party payment in a credit register, showing which claim track it reduces.

8. Obtain a line-by-line agreement and close-out

Issue the schedule with evidence references, formulas, open questions and reservations of rights. Ask the insurer, carrier, seller or their adjusters to mark each line agreed, queried, rejected or pending. Record settlement allocation and any subrogation document before releasing original evidence. Close the operational, inventory and accounting files together.

Keep five requirement types separate

  • Legal requirement: applicable insurance, carriage, evidence and limitation law can control valuation, liability, rights and deadlines.
  • Trade reference: the IUMI-hosted cargo guide describes useful claims practice but does not bind an insurer, carrier or court.
  • Voluntary method: a valuation, survey or laboratory protocol supports consistency only when suitable and accepted for the decision.
  • Buyer specification: the twelve-line schedule defines evidence, calculations, approvals, version control and stop triggers.
  • Contract requirement: the sale, insurance, carriage, survey and storage contracts determine promised performance, coverage, liability and remedies.

Common buyer mistakes

  • Claiming the full invoice while only part of the lot is affected.
  • Mixing package count, net weight and gross weight.
  • Using invoice price as both sound and damaged arrival value without support.
  • Calling reconditioning cost the cargo loss.
  • Subtracting salvage twice.
  • Adding insurer, carrier and seller demands as if they were separate losses.
  • Applying the deductible before confirming the correct loss base.
  • Ignoring carrier limits, declared value and suit deadlines.
  • Changing currency rates between schedule versions.
  • Accepting a lump-sum settlement without allocating its effect on remaining rights.

Practical conclusion

Use the sequence freeze documents - reconcile quantity - lock disposition - evidence values - calculate each track - apply costs and credits once - agree line by line - close rights and accounts. If quantity, valuation basis or credit allocation cannot be reproduced, the claim is not ready for settlement.

Prevention still starts before loading: agree the bulk tea specification, packing, insurance and claim documents in the purchase contract. To discuss product, pack, quantity and destination for a new order, send Yunjing Tea the buying requirements.

Sources checked 6 November 2026: the United Kingdom's current Marine Insurance Act 1906, especially sections 67-81 on measure of indemnity, sue and labour, subrogation and under-insurance; the UK's current Carriage of Goods by Sea Act 1971, Schedule, including Hague-Visby Articles III rule 6 and IV rule 5; and New India Assurance's Guide to Marine Cargo Insurance, printed December 2013 and currently hosted by IUMI. Confirm the actual governing law, policy, carriage contract, valuation evidence, liability limits and live deadlines for the shipment.