Write a bulk tea quantity tolerance as a controlled calculation, not as “about one container” or an unexplained plus/minus percentage. The contract should identify the base quantity, unit and measurement basis; where the tolerance applies; whether it permits short shipment, over shipment or both; the minimum and maximum; packing-rounding rules; unit price; evidence; approval; and final settlement. Without those fields, production, logistics, finance and the bank can each reach a different “acceptable” quantity.

This checklist controls commercial quantity, not destination rules for package net contents, customs, container safety or food conformity. Build the baseline with the bulk green tea purchase specification, then carry the quantity rule into the order, payment instrument, packing list and inspection instruction.

Build one twelve-field quantity control record

FieldContract questionStop trigger
1. Base quantityWhat exact number is the percentage calculated from?“One container,” “approximately” or a forecast replaces a number
2. Unitkg, metric tonne, bag, carton or another coded unit?Mass and package-count units are mixed without conversion
3. Weight basisNet tea, gross packed weight or another expressly defined basis?Tare, pallet, liner or moisture basis is unclear
4. Application levelPer line, grade, lot, shipment, container or total order?A surplus on one grade offsets a shortage on another without permission
5. DirectionShort only, over only, or symmetrical?“±” appears although the buyer cannot receive or pay an excess
6. LimitWhat percentage or absolute quantity is allowed?Different PO, contract or credit tolerances coexist
7. Packing incrementHow are whole bags/cartons and any partial pack handled?Permitted range cannot be reached with the approved pack size
8. Price ruleIs actual accepted quantity paid at the contract unit rate?Total price is treated as fixed while quantity floats
9. Approval gateMust the buyer approve the planned final quantity before packing or shipment?Supplier allocates an excess after the irreversible gate
10. MeasurementWhich scale, location, date, tare method and record establish quantity?Invoice quantity is copied without independent source evidence
11. DocumentsWhich values must reconcile across invoice, packing list, inspection and transport records?Net, gross, package count or unit differs without explanation
12. SettlementHow are final amount, shortage, rejected excess and claims closed?Payment or inventory is closed before actual accepted quantity is known

Convert the percentage into numbers before accepting the order

For an order of 10,000 kg net with ±2%, the permitted total is 9,800 to 10,200 kg. If the approved pack is exactly 25 kg net and only whole bags are permitted, that range is 392 to 408 bags.

Do not use one tolerance for two questions. Order-level ±2% does not automatically permit each bag labelled 25 kg to contain 24.5 kg, excuse scale uncertainty, or offset one grade's shortage with another grade's excess. Package rules and measurement controls are jurisdiction-specific.

Run an eight-step quantity workflow

1. Define the commercial object

List each tea line, grade, lot strategy and destination. Decide whether the buyer needs an exact input, minimum usable quantity, maximum capacity or flexible shipment. Apply the tolerance at the narrowest level that matters: a total-order tolerance cannot silently reduce a critical grade.

2. Freeze the unit and weight basis

Use an unambiguous unit and state net or gross weight. UNCITRAL's CISG article 56 says that, if price is fixed by weight and there is doubt, it is determined by net weight; that rule matters only when the CISG applies and the parties have not resolved the point. A safer contract names net tea weight, approved pack net weight, tare components, weighing point and allowed rounding. UNECE Recommendation 20 supplies standard codes for trade units; it does not create a tolerance.

3. State direction, level and mathematical limits

Write both the formula and the resulting minimum/maximum. For example: “10,000 kg net, buyer may accept 0% short and up to 1% over, applied separately to each grade; maximum 10,100 kg.” Avoid “about,” “more or less” and “subject to production” unless the contract gives those words an exact meaning. Record the same rule in the purchase-order acknowledgement.

4. Reconcile packing increments and capacity

Divide the limits by the approved pack net weight and define rounding. State whether a partial pack is prohibited, separately marked or buyer-approved. Check pallet count, payload and volume. Do not confuse commercial tea quantity with verified gross mass for container safety; use the container VGM checklist.

5. Align price, funding and the payment instrument

State whether the invoice equals accepted net quantity times unit price, subject to a maximum amount. Reserve funding for permitted excess and reconcile deposits. For a documentary credit, check UCP 600 article 30 separately: its rules for “about,” quantity and drawings do not amend the sale contract. Make contract and credit limits compatible.

6. Approve the planned final quantity before shipment

Require planned packages and net quantity before final packing, inspection or booking. Check line limits, demand, space, credit amount and transport capacity. A permitted variance is a ceiling, not an automatic supplier entitlement. Name who may approve an excess and by what record.

7. Measure and reconcile evidence

At pre-shipment inspection, reconcile package count, declared net, gross, tare and scale records. Compare invoice, packing list, inspection certificate and bill of lading instructions. A transport document may evidence packages or gross weight without proving contract net tea quantity.

8. Settle against accepted quantity and close exceptions

On receipt, preserve seal, package-count and weight evidence and follow the arrival inspection and release plan. Separate a seller's planned contract variance from transit shortage, damaged packages, rejected tea or measurement error. Pay and receive inventory for the accepted basis only. Record credits, additional invoices or claims and close the order when finance, quality and stock records agree.

Use pass, clarify and stop decisions

  • Pass: base, unit, net/gross basis, level, direction, limits, pack rounding, price and evidence are aligned; planned and actual quantities fall within the same approved rule.
  • Clarify: the intended range is commercially acceptable but one administrative field, conversion or approval is missing; keep packing, shipment and payment at a reversible gate.
  • Stop: the unit or basis is ambiguous; tolerance is applied at the wrong level; a line is below its minimum; excess lacks approval or funding; contract and credit conflict; documents cannot reconcile; or the variance may be transit loss rather than planned delivery.

Keep requirement types separate

  • Legal requirement: applicable sales, weights-and-measures, customs, food-labelling and package rules may govern different quantity statements.
  • Governing sales law: CISG articles 35, 51, 52 and 56 address contractual quantity conformity, partial delivery, excess quantity and net-weight pricing when the Convention applies; the contract and facts still control the case.
  • Banking rule: UCP 600 applies when incorporated into a documentary credit and governs documentary examination, not physical goods or the sale contract.
  • Trade reference: UNECE Recommendation 20 standardises unit codes for trade data but sets no commercial allowance.
  • Buyer specification: the twelve-field record defines the buyer's operational range, evidence and stop triggers.
  • Contract requirement: the signed agreement should state the permitted quantity, price effect, approval, documents and remedy, subject to mandatory law.

Common buyer mistakes

  • Writing “±5%” without saying whether it applies per grade, lot, shipment or total order.
  • Allowing both short and over shipment when the buyer only needs upward flexibility.
  • Using gross container or pallet weight as the payable tea quantity.
  • Ignoring whole-bag rounding until after the tolerance is agreed.
  • Assuming UCP 600 supplies the sale contract's default tolerance.
  • Letting surplus low-value tea offset a shortage of a required grade.
  • Paying a fixed total while accepting a variable quantity without a unit-price reconciliation.
  • Treating arrival shortage as a planned production variance.

Practical conclusion

Use the sequence define the line - fix unit and basis - write direction and limits - test pack increments - align price and credit - approve planned quantity - reconcile evidence - settle accepted quantity. A useful tolerance absorbs legitimate production and packing variation while preserving the buyer's minimum supply, maximum exposure and audit trail.

Put the calculation in the contract, PO acknowledgement, inspection instruction and payment documents before production. To align grade, quantity, packing and shipment fields for a bulk green tea quotation, send Yunjing Tea the buying requirements.

Sources checked 11 November 2026: UNCITRAL's official CISG overview and text, adopted 11 April 1980 and effective 1 January 1988, especially articles 35, 51, 52 and 56; the ICC's current online text of UCP 600, effective 1 July 2007, especially articles 4, 5, 14 and 30; and UNECE's Recommendation No. 20 codes for units of measure used in international trade, including Revision 17 annexes published in 2021. Confirm the governing law, contract, destination measurement/package rules and exact credit wording for the order.